The Spruce and North Fifth Street Construction Project brings traffic changes.
From the City of Bellaire: The construction of the Bonds for Better Bellaire 2016 Spruce Street and North Fifth Street Project is underway. The traffic patterns in the area have been changed to accommodate construction activities and keep drivers safe. Traffic...2019 Bond Election will not be needed in Bellaire.
Mayor Friedberg says a bond election in 2019 will not be needed and that the city will “be able to maintain the same pace of infrastructure work for at least another year with existing bond authority.” The Bonds for Better Bellaire 2016 program was...Recent Posts
-
Suspect Steals Items From Garage on Merideth Dr
From the Bellaire Police Department: On 12/30/2025 at...
By BellaireConnect , 2 months ago
-
From the Bellaire Police Department: On 11/29/2025, a...
By BellaireConnect , 3 months ago
-
BPD Investigates Gunshots at Bellaire Chevron
From the Bellaire Police Department: At approximately...
By BellaireConnect , 4 months ago
-
Checks Stolen From Bellaire Post Office
From the Bellaire Police Department: The Bellaire Pol...
By BellaireConnect , 5 months ago
-
From the Bellaire Police Department: On 08/25/2025 at...
By BellaireConnect , 6 months ago








